Housekeeping

  • All common areas shall be kept clean at all times. These areas include but are not limited to building common corridors and lobbies, restrooms, stairwells, elevators, loading dock, and the property grounds.
  • Building Management expects a clean and safe job-site throughout the duration of the project.
  • Construction debris and trash shall be designated and contained in one location of the project and removed from the job-site as soon as possible. Building Management reserves the right to require trash removal on demand. Include in the bid any costs to move any building inventory within the site.
  • Construction debris and trash shall not be stored in mechanical rooms, freight lobbies, adjacent spaces or any other location outside of the job site. The management office will remove unauthorized trash without notice to the contractor and the cost of the trash removal will be deducted from the project contract.
  • All trash removal shall be scheduled for weekends, or Monday through Friday between the hours of 6:00 p.m. and 7:00 a.m. It shall be the contractors’ responsibility to move building inventory that will not be used in the project.
  • Contractor shall provide damp walk off mats at each exit from the job site. Mats shall be maintained or replaced as necessary to prevent construction dust from being tracked throughout the buildings.
  • Mechanical and electrical rooms shall be broom cleaned daily. Panel covers shall be replaced on all active electrical panels daily. Mechanical and electrical rooms will require painting (walls and floors) by the general contractor upon completion of the project.