Contractor Guidelines General Building Guidelines Insurance Moving Procedures Smoking
Contractor Guidelines
Page: 4 of 12 Back  |  Next

  • A clear self-adhering poly film will be furnished and installed by the contractor on all traffic areas within the tenant’s leased premises and on all common building traffic areas for the duration of the project. This product is to be included as a cost of the project. Construction and service personnel are expected to do whatever is necessary to protect building surfaces.
  • All building common hallways, lobbies and freight vestibules must be protected with masonite for the duration of the project. Construction and service personnel are expected to do whatever is necessary to protect building surfaces.
  • The contractor is required to vacuum and/or broom clean occupied tenant areas and the building common areas that are affected by project construction daily at the contractor’s cost.
  • The contractor is required to wipe down any areas of the occupied tenant areas and the building common areas that are affected by project construction daily at the contractor’s cost.
  • The contractor is required to paint as needed the electrical and mechanical rooms at the completion of the each project. Both the floors and the walls are to be patched and painted from corner to corner to address gouges, scratches, graffiti, etc. which occur during the course of the project construction.
  • The contractor is required to relocate any building stock which is being stored in the designated work area for the project at no additional charge. Building Engineering Staff will advise on the new location for the stock.