quick links
Property Image
Contractor Guidelines General Building Guidelines Insurance Moving Procedures Smoking
General Building Guidelines
Page: 5 of 6 Back  |  Next

  • The Property Management Office will be provided a copy of the building permit which has been "finalized" by the appropriate inspector. As the Owner is responsible for the construction related changes in the building, the cooperation of the tenant in providing the permit copy is appreciated. An application for a permit is not satisfactory, although in approved circumstances, the work may begin if contractor assumes all responsibility in obtaining the final permit and complies with all inspection requirements.
  • Tenant will not make any alterations or physical additions in or to the premises without first obtaining the written consent of Landlord.
  • Tenant is requested to submit a service request via the Service Request System prior to the initiation of any requested work by the Building Engineering staff.
  • Tenant will prevent any utilization of "temporary" and/or "permanent" electrical extension cords, outlet multipliers or similar devices as outlined in Section 400-8 of the National Electrical Code. Such devices should be replaced by permanently affixed outlets properly installed by a licensed electrician.
  • All routine deliveries to tenant's premises shall be made between the hours of 7:00 a.m. and 5:00 p.m., via the freight elevators only. Passenger elevators are to be used only for the movement of persons, unless an exception is approved by the Building Management Office.

Powered by ETS. ©2024 All rights reserved. | |